Skip to main content

Central Pacific Railway Co. - Bond

Inv# RB7061   Bond
Central Pacific Railway Co. - Bond
State(s): New York
Years: 1899

$500 4% Gold Bond printed by American Bank Note Company, New York. Portrait of C.P. Huntington. Very Rare!

The Central Pacific Railroad (CPRR) was a rail company chartered by U.S. Congress in 1862 to build a railroad eastwards from Sacramento, California, to complete the western part of the "First Transcontinental Railroad" in North America. Incorporated in 1861, CPRR ceased operation in 1885 when it was acquired by Southern Pacific Railroad as a leased line.

Following the completion of the Pacific Railroad Surveys in 1855, several national proposals to build a transcontinental railroad failed because of the energy consumed by political disputes over slavery. With the secession of the South in 1861, the modernizers in the Republican Party controlled the US Congress. They passed legislation in 1862 authorizing the central rail route with financing in the form of land grants and government railroad bond, which were all eventually repaid with interest. The government and the railroads both shared in the increased value of the land grants, which the railroads developed. The construction of the railroad also secured for the government the economical "safe and speedy transportation of the mails, troops, munitions of war, and public stores."

Planned by Theodore Judah, the Central Pacific Railroad was authorized by Congress in 1862. It was incorporated in 1861 by Judah and "The Big Four" (who called themselves "The Associates"): Sacramento, California businessmen Leland Stanford, Collis Huntington, Charles Crocker, and Mark Hopkins. Stanford was elected president (at the same time he was elected governor), Huntington vice-president in charge of fund raising and purchasing, and Hopkins treasurer. Crocker was in charge of construction, which began officially in 1863 when the first rails were laid in Sacramento.

Construction proceeded in earnest in 1865 when James Harvey Strobridge, the head of the construction work force, hired the first Cantonese emigrant workers at Crocker's suggestion. The construction crew grew to include 12,000 Chinese laborers by 1868, when they constituted eighty percent of the entire work force. The "Golden spike", connecting the western railroad to the Union Pacific Railroad at Promontory, Utah, was hammered on May 10, 1869. Coast-to-coast train travel in eight days became possible, replacing months-long sea voyages and lengthy, hazardous travel by wagon trains.

In 1885 the Central Pacific Railroad was acquired by the Southern Pacific Company as a leased line. Technically the CPRR remained a corporate entity until 1959, when it was formally merged into Southern Pacific. (It was reorganized in 1899 as the Central Pacific "Railway".) The original right-of-way is now controlled by the Union Pacific, which bought Southern Pacific in 1996.

The Union Pacific-Central Pacific (Southern Pacific) main line followed the historic Overland Route from Omaha, Nebraska to San Francisco Bay.

Chinese labor was the most vital source for constructing the railroad. Fifty Cantonese emigrant workers were hired by the Central Pacific Railroad in February 1865 on a trial basis, and soon more and more Cantonese emigrants were hired. Working conditions were harsh, and Chinese were compensated less than their white counterparts. Chinese laborers were paid thirty-one dollars each month, and while white workers were paid the same, they were also given room and board. In time, CPRR came to see the advantage of good workers employed at low wages: "Chinese labor proved to be Central Pacific's salvation."

Construction of the road was financed primarily by 30-year, 6% U.S. government bonds authorized by Sec. 5 of the Pacific Railroad Act of 1862. They were issued at the rate of $16,000 ($265,000 in 2017 dollars) per mile of tracked grade completed west of the designated base of the Sierra Nevada range near Roseville, CA where California state geologist Josiah Whitney had determined were the geologic start of the Sierras' foothills. Sec. 11 of the Act also provided that the issuance of bonds "shall be treble the number per mile" (to $48,000) for tracked grade completed over and within the two mountain ranges (but limited to a total of 300 miles (480 km) at this rate), and "doubled" (to $32,000) per mile of completed grade laid between the two mountain ranges. The U.S. Government Bonds, which constituted a lien upon the railroads and all their fixtures, were repaid in full (and with interest) by the company as and when they became due.

Sec. 10 of the 1864 amending Pacific Railroad Act (13 Statutes at Large, 356) additionally authorized the company to issue its own "First Mortgage Bonds" in total amounts up to (but not exceeding) that of the bonds issued by the United States. Such company-issued securities had priority over the original Government Bonds. (Local and state governments also aided the financing, although the City and County of San Francisco did not do so willingly. This materially slowed early construction efforts.) Sec. 3 of the 1862 Act granted the railroads 10 square miles (26 km2) of public land for every mile laid, except where railroads ran through cities and crossed rivers. This grant was apportioned in 5 sections on alternating sides of the railroad, with each section measuring 0.2 miles (320 m) by 10 miles (16 km). These grants were later doubled to 20 square miles (52 km2) per mile of grade by the 1864 Act.

Although the Pacific Railroad eventually benefited the Bay Area, the City and County of San Francisco obstructed financing it during the early years of 1863–1865. When Stanford was Governor of California, the Legislature passed on April 22, 1863, "An Act to Authorize the Board of Supervisors of the City and County of San Francisco to take and subscribe One Million Dollars to the Capital Stock of the Western Pacific Rail Road Company and the Central Pacific Rail Road Company of California and to provide for the payment of the same and other matters relating thereto" (which was later amended by Section Five of the "Compromise Act" of April 4, 1864). On May 19, 1863, the electors of the City and County of San Francisco passed this bond by a vote of 6,329 to 3,116, in a highly controversial Special Election.

The City and County's financing of the investment through the issuance and delivery of Bonds was delayed for two years, when Mayor Henry P. Coon, and the County Clerk, Wilhelm Loewy, each refused to countersign the Bonds. It took legal actions to force them to do so: in 1864 the Supreme Court of the State of California ordered them under Writs of Mandamus (The People of the State of California ex rel the Central Pacific Railroad Company vs. Henry P. Coon, Mayor; Henry M. Hale, Auditor; and Joseph S. Paxson, Treasurer, of the City and County of San Francisco. 25 Cal. 635) and in 1865, a legal judgment against Loewy (The People ex rel The Central Pacific Railroad Company of California vs. The Board of Supervisors of the City and County of San Francisco, and Wilhelm Lowey, Clerk 27 Cal. 655) directing that the Bonds be countersigned and delivered.

In 1863 the State legislature's forcing of City and County action became known as the "Dutch Flat Swindle". Critics claimed the CPRR's Big Four intended to build a railroad only as far as Dutch Flat, California, to connect to the Dutch Flat-Donner Pass Wagon Road to monopolize the lucrative mining traffic, and not push the track east of Dutch Flat into the more challenging and expensive High Sierra effort. CPRR's chief engineer, Theodore Judah, also argued against such a road and hence against the Big Four, fearing that its construction would siphon money from CPRR's paramount trans-Sierra railroad effort. Despite Judah's strong objection, the Big Four incorporated in August 1863 the Dutch Flat-Donner Lake Wagon Road Company. Frustrated, Judah headed off for New York via Panama to raise funds to buy out the Big Four from CPRR and build his trans-Sierra railroad. Unfortunately, Judah contracted yellow fever in Panama and died in New York in November 1863.

A replica of the Sacramento, California Central Pacific Railroad passenger station is part of the California State Railroad Museum, located in the Old Sacramento State Historic Park.

Nearly all the company's early correspondence is preserved at Syracuse University, as part of the Collis Huntington Papers collection. It has been released on microfilm (133 reels). The following libraries have the microfilm: University of Arizona at Tucson; and Virginia Commonwealth University at Richmond. Additional collections of manuscript letters are held at Stanford University and the Mariners' Museum at Newport News, Virginia. Alfred A. Hart was the official photographer of the CPRR construction.

The Central Pacific's first three locomotives were of the then common 4-4-0 type, although with the American Civil War raging in the east, they had difficulty acquiring engines from eastern builders, who at times only had smaller 4-2-4 or 4-2-2 types available. Until the completion of the Transcontinental rail link and the railroad's opening of its own shops, all locomotives had to be purchased by builders in the northeastern U.S. The engines had to be dismantled, loaded on a ship, which would embark on a four-month journey that went around South America's Cape Horn until arriving in Sacramento where the locomotives would be unloaded, re-assembled, and placed in service.

Locomotives at the time came from many manufacturers, such as Cooke, Schenectady, Mason, Rogers, Danforth, Norris, Booth, and McKay & Aldus, among others. The railroad had been on rather unfriendly terms with the Baldwin Locomotive Works, one of the more well-known firms. It is not clear as to the cause of this dispute, though some attribute it to the builder insisting on cash payment (though this has yet to be verified). Consequently, the railroad refused to buy engines from Baldwin, and three former Western Pacific Railroad (which the CP had absorbed in 1870) engines were the only Baldwin engines owned by the Central Pacific. The Central Pacific's dispute with Baldwin remained unresolved until well after the road had been acquired by the Southern Pacific.

In the 1870s, the road opened up its own locomotive construction facilities in Sacramento. Central Pacific's 173 was rebuilt by these shops and served as the basis for CP's engine construction. The locomotives built before the 1870s were given names as well as numbers. By the 1870s, it was decided to eliminate the names and as each engine was sent to the shops for service, their names would be removed. However, one engine that was built in the 1880s did receive a name: the El Gobernador.

Construction of the rails was often dangerous work. Towards the end of construction, almost all workers were Chinese immigrants. The ethnicity of workers depended largely on the "gang" of workers/specific area on the rails they were working.

The following CP engines have been preserved:

Timeline

1861

  • June 28, 1861: "Central Pacific Rail Road of California" incorporated; name changed to "Central Pacific Railroad of California" on October 8, 1864, after the Pacific Railway Act amendment passes that summer.

1862

1863

1864

  • April 26, 1864: Central Pacific opened to Roseville, 18 miles (29 km), where it makes a junction with the California Central Railroad, operating from Folsom north to Lincoln.
  • June 3, 1864: The first revenue train on the Central Pacific operates between Sacramento and Newcastle, California
  • October 8, 1864: Following passage of the amendment to the Pacific Railroad Act, the company's name is changed to "Central Pacific Railroad of California," a new corporation.

1865

  • February 1865: Central Pacific hired its first 50 Cantonese emigrant laborers on a trial basis.
  • May 13, 1865: Central Pacific opened 36 miles (58 km) to Auburn, California.
  • September 1, 1865: Central Pacific opened 54 miles (87 km) to Colfax, California (formerly known as "Illinoistown.")

1866

1867

  • June 25, 1867: 5,000 Chinese railroad workers went on strike in protest against the longer hours and wage inequality they were facing.
  • August 28, 1867: The Sierra Nevadas were finally "conquered" by the Central Pacific Railroad, after almost five years of sustained construction effort by its mainly Chinese crew about 10,000 strong, with the successful completion at Donner Pass of its 1,659-foot (506 m) Tunnel No. 6 (a.k.a. the "Summit Tunnel").
  • December 1, 1867: Central Pacific opened to Summit of the Sierra Nevada, 105 miles (169 km).

1868

  • June 18, 1868: The first passenger train crosses the Sierra Nevada to Lake's Crossing (modern day Reno, Nevada) at the eastern foot of the Sierra in Nevada.

1869

1870

1876

1877

1883

  • November 18, 1883: A system of one-hour standard time zones for American railroads was first implemented. The zones were named Intercolonial, Eastern, Central, Mountain, and Pacific. Within one year, 85% of all cities having populations over 10,000, about 200 cities, were using standard time.

1885

1888

  • June 30, 1888: Listed by ICC as a "non-operating" subsidiary of Southern Pacific.

1899

  • July 29, 1899: Central Pacific is reorganized as the "Central Pacific Railway".

1959

  • June 30, 1959: Central Pacific is formally merged into the Southern Pacific.

Read More

Read Less

Condition: Excellent

A bond is a document of title for a loan. Bonds are issued, not only by businesses, but also by national, state or city governments, or other public bodies, or sometimes by individuals. Bonds are a loan to the company or other body. They are normally repayable within a stated period of time. Bonds earn interest at a fixed rate, which must usually be paid by the undertaking regardless of its financial results. A bondholder is a creditor of the undertaking.

Item ordered may not be exact piece shown. All original and authentic.
OUT OF STOCK